Bridge Dynamic Deflection Measurement
Chongqing Inner Ring Bridge Dynamic Deflection Measurement
An SR-M200 mid-range MIMO radar was used in a bridge dynamic deflection demonstration to verify synchronized multi-point sensing across one section.
Multi-point synchronized measurementDynamic deflection curvesComparison with existing test data

Synchronized points
10
Reference load-test result
Approx. 1.64 mm
Measured peak deflection
Approx. 1.61 mm
Deployment
Mid-range under-bridge installation with synchronized points across the girder section.
Case figures describe the relevant demonstration project. Actual performance depends on site conditions, project configuration and the technical agreement.